
Did You Know?
One recycled plastic bottle would save enough energy to power a 60-watt light bulb for 3 hours!
Search
Latest News
Enviroparks Hirwaun Runner Up in Energy Award
15 June 2009
Environmental Statements
6 January 2009
Liaison Group
7 November 2008
Proposed Site Elevations
The height of the main buildings has been limited to 14 metres, with the exhaust stacks at 16.5 metres the highest structures on site.
The tanks for the Anaerobic Digestors are 12 metres above ground.
All structures on site are below the top of the adjoining Penderyn Reservoir.
